Process Improvement · Lean Six Sigma · Evidence First

Process improvement consulting
that starts with what your operation already does.

Go2Cab runs process improvement engagements on the business you operate today: finance, supply chain and back-office processes observed, measured and redesigned with Lean Six Sigma, on-site and remotely from Sydney. Every gain is stated against a baseline captured before anything changed, so the improvement can be checked later by someone who was not in the room. No platform purchase is required, and no gain is claimed that the data cannot show.

DMAIC

Lean Six Sigma method

Baseline

Captured before the change

Standalone

No platform required

MBB-led

Master Black Belt direction

Buying or replacing a platform, and need the process settled before configuration?

Process-led Dynamics 365 implementation
What We Change

What Does Process Improvement Actually Change?

Four things, in this order. Everything else in an engagement is in service of one of them — which is why the scope of the work is short, and why the result can be audited against the numbers you ran before we arrived.

Cycle time and lead time

Where work waits rather than moves: approvals queued for a person, batches held for a run, invoices parked until month end. Measured, then removed.

Variation and rework

The same task done four different ways, and the rework that follows. We quantify capability before we touch the process, so the fix is aimed at a cause instead of a symptom.

Handoffs and ownership

Steps that exist only because two functions never agreed a boundary. Each handoff is a delay and a place for information to be lost.

Control and cadence

What is measured, how often, by whom, and what happens when a limit is crossed. A process without a control point drifts back within two quarters.

What it is notstated plainly, because the market is vague

  • A training course that leaves the process exactly as it was.

  • A document that gets signed off and never read again.

  • A headcount reduction dressed up as efficiency.

  • Averages presented as proof while the distribution underneath is ignored.

If a step in your process cannot be tied to a number that moves, it does not belong in the engagement. That is also the standard we hold when the work is done — see process-led implementation for how the same standard carries into a platform build.

The Method

How Does a Lean Six Sigma Engagement Actually Run?

DMAIC, in sequence, with the deliverable of each phase written down before the phase starts. There is no phase where the findings are held back until the final presentation — the baseline, the causes and the pilot result are all put in front of you as they are produced.

D

Define

Phase 1 of 05

Scope the value stream, name the customer and the requirement, and state the business case in the numbers the business already reports. If the case will not survive that test, it stops here.

Leaves behind

Charter, scope boundary, quantified business case

M

Measure

Phase 2 of 05

Capture the baseline: cycle time, throughput, defect rate, process capability — with measurement system error checked first, so the baseline itself can be trusted.

Leaves behind

Baseline ledger, capability study, data collection plan

A

Analyse

Phase 3 of 05

Find the causes worth acting on, using distributions and hypothesis testing rather than a chart of averages. Root causes are ranked by the size of the effect they explain.

Leaves behind

Verified root causes, ranked by contribution

I

Improve

Phase 4 of 05

Design the future state around the causes, pilot it on a live slice of the operation, and prove the gain against the baseline before it is rolled out beyond the pilot.

Leaves behind

Future-state design, standard work, pilot result

C

Control

Phase 5 of 05

Put the gain under control: control points, limits, a named owner and a review cadence, with alerts tied to the limits rather than to somebody noticing.

Leaves behind

Control plan, SPC points, owner and cadence

Where a process needs statistical depth beyond the standard toolkit — design of experiments, regression, reliability — it is applied at the point it changes a decision, not added to make a report look thorough.

Where It Pays

Which Processes Are Worth Improving First?

The ones that already have data a finance or operations manager trusts. Those three areas are where the baseline is cheapest to capture and the gain is easiest to defend.

Invoice to payment, close to report

Finance operations

Invoice cycle time, touchless rate, exception queues and the number of days the ledger takes to close. Most finance waste sits in rework between three systems, not in the software itself.

  • Invoice cycle time
  • Touchless invoice rate
  • Days to close
  • Rework per transaction

Forecast to replenishment

Supply chain and inventory

Stock turns, excess and obsolete holding, fill rate and the gap between forecast and actual demand. Reducing holding while holding service level is the whole exercise.

  • Inventory turns
  • Excess stock value
  • Fill rate
  • Forecast error (MAPE)

Request to resolution

Service and back office

First-contact resolution, queue age, reopens and the handoffs between teams that generate most of the delay. Often the cheapest engagement to prove a return on.

  • First-contact resolution
  • Queue age
  • Reopen rate
  • Cost per resolution

Where those measures live in systems that disagree with each other, the disagreement is the first finding. Measuring it properly is the same work that precedes any process-led implementation.

How to Commission It

Can You Improve the Process Without Buying a Platform?

Yes, and most of the time that is the right first step. Three shapes of engagement, all scoped and priced separately from software.

Standalone

Process improvement programme

The operation improved on the systems you already run. No platform decision is forced, and the data model is delivered as a requirement set rather than a build.

Typical span: 6–12 weeks for one value stream

With a platform

Process improvement, then implementation

The same engagement continues into Microsoft Dynamics 365 or Business Central once the redesigned process justifies it — configured around the process, not around a vendor template.

One engagement, evidence before configuration

Read more
Capability

Training and BAU support

Where the gap is skill rather than system: DMAIC and statistics taught against your own process data, and managed support while your team takes the controls over.

On-site or remote, from Sydney

Read more

Where prediction changes the number

Some processes only move once the operation can see ahead of time: demand that swings, exceptions that surface at close, drift nobody watches. That work is described on its own page — advanced analytics and AI — and is measured against the same baseline as everything else here.

How a Claim Is Proven

Why Trust a Process Improvement Result?

Because it is checkable. Four things are true of every engagement, and any one of them missing means the work is not finished.

  • A baseline on your own measures, recorded before anything was touched.

  • Distributions and capability, not a single average presented as the proof.

  • A pilot result before anything is rolled out across the operation.

  • A control point with an owner and a cadence, so the gain survives the engagement.

Start with one value stream.

Bring one process that hurts and the numbers you already report on it. The first hour is spent on your operation, not on a demonstration, and it ends with a view of what the data would have to show.

Process improvement · Lean Six Sigma · Sydney, working across Australia